Paddington Station
The works involved the installation of additional security measures due to repeated access to the roof space. This was featured in a channel 5 documentary. The works involved installing 250 meters of anti-climb rollers to the taxi area. Plus, the installation of 80 meters of bespoke 358 mesh fencing to Sail bridge. This was carefully managed with the station with the critical elements being installed under possession and isolation.
Client: Sisk Rail
Stakeholders: Network Rail, MTR Crossrail and Great Western Railway
Warminster bridge
The works involved the design, supply and installation of a GRP applied surface to the station overbridge.
MLG worked closely with Polydeck to design the applied surfaces as a team - we work together frequently to deliver surface installation requirements across the country.
Client: Great Western Railway
Stakeholders: Network Rail
Tesco EXtra Yate
Emergency works to make safe an area of cladding to store floor above the car-park. MLG were called on P1 (4 Hour) attendance where we located the fault and identified the risk. We quickly reacted and set up an exclusion zone with 50 barriers. We then identified the process to safely remove the material and started work on a 24hr basis using our MEWP’s and IPAF trained operatives to remove the defective section in total 240m2 was removed.
Client: Lancer Scott
Stakeholders: Tesco