Didcot thames valley signalling centre (TVSC)
MLG carried out works to platform floor. The spec was to mechanically abrade the surface then apply a two coat epoxy resin to seal the porous concrete floor.
Client: Sisk Rail
Stakeholders: Network Rail
Cardiff Wales regional operation centre (WROC)
MLG carried out refurbishment to the staff kitchen and break area. The works were carried out while the centre was operational and were meticulously planned so as to cause zero disruption.
Client: SSE Rail
Stakeholders: Network Rail
Hanwell Station
MLG carried out the installation of the applied surface system to the access framework.
Client: Polydeck
Stakeholders: Caple CS, J Murphy and Sons, Network Rail, MTR Crossrail