Alstone Signal Box, Cheltenham
MLG carried out the complete external refurbishment of the operational signal box and level crossing. The remit included extensive timber repairs to all elevations and full preperation and decoration to Network Rail specifications T50/T51. Works were carried out during day and night shift with possession for the front and side elevations.
Client: Sisk Rail
Stakeholders: Network Rail
Brimscombe Signal Box, Stroud
MLG carried out the complete external refurbishment of the operational signal box and level crossing. The remit included extensive timber & brickwork repairs to all elevations and full preparation and decoration to Network Rail specifications T50/T51. Works were carried out during day and night shift with possession for the front and side elevations.
Client: Sisk Rail
Stakeholders: Network Rail
St Andrews Signal Box, Avonmouth
MLG carried out the complete external refurbishment of the operational signal box and level crossing. The remit included extensive timber repairs to all elevations and full preparation and decoration to Network Rail specifications T50/T51. Works were carried out during day and night shift with possession for the front and side elevations. The original sign of the signal box was fully refurbished and installed on completion.
Client: Sisk Rail
Stakeholders: Network Rail